How to Apply for Net Metering in Pakistan

Net Metering in Pakistan is at a rapid transition to renewable energy, one that is predominantly driven by the growing urgency to address power shortages, costlier electricity, and environmental concerns. And the easiest and efficient solutions include net metering. Net metering allows the electricity consumers to generate solar power, use it, and export the leftover energy to the national grid. Net metering consumes an electricity management system that enables individuals who do their own renewable installations broadly speaking, solar PV schemes, to connect to the national grid through special net metering meters also known as bidirectional meters. This net meter takes stock of both the electricity that is exported back into the system and the electricity imported from the grid. When the amount of power generated by your solar system exceeds what you consume, the excess flows back to the grid. Net meter runs backwards, crediting your account in your name to the excess supply. If the solar generation falls short, for example, at night, then you draw power from the grid and are billed for the net consumption. This exchange mechanism encourages clean energy generation, regulation of electricity bills, and the overall realization of energy transition objectives for Pakistan.

Who can Avail of this Net Metering Facility in Pakistan?

net metering scheme eligibility criteria set primarily by NEPRA and local DISCOs ensure safe and effective deployment of net metering across Pakistan.

To apply for it, an applicant must meet certain criteria:

  1. It should have an active electricity connection (single-phase or three-phase) under the jurisdiction of a recognized DISCO (e.g., LESCO, MEPCO, K-Electric).
  2. Own property or legally authorized occupant in which the solar system is installed.
  3. Install a renewable energy system (typically solar PV) with a capacity between 1 kW and 1 MW, according to technical safety standards.
  4. Ensure that the system is integrated with a net metering meter approved and compatible with NEPRA’s regulations.
  5. Contract authorized, AEDB-registered vendors for installation (under current AEDB guidelines and government regulations).

Generally, these rules cover all kinds of customers, such as residential, commercial, industrial, and even government entities thus allowing maximum reach of the net metering benefits.

Choosing System and Understanding Net Metering Prices in Pakistan

  1. A very important consideration before net metering scheme application for it is determining the right load capacity of your solar system and the parameters defining the net metering price in Pakistan.
  1. According to specifications, more sophisticated functionalities (including remote connectivity), and country of origin approved net meters cost approximately PKR 20,000 to PKR 60,000.
  1. The entire net metering cost in Pakistan, i.e., solar panels, inverter, system design, installation, and net metering meter, is highly variable. A typical range for a 1 kW system is PKR 150,000-220,000.
  1. Economies of scale in larger systems (10kW to 1MW) drive the per-kW costs down; however, a more sophisticated design and permissions are required.
  1. It is important to select net meters that are NEPRA-approved and compatible with DISCO infrastructure to avoid delays or technical faults.
  1. Careful budgeting and selection of vendors will help you get the ideal match between the system and net meter to the energy you intend consuming and exporting.

Important Documents for Application to Net Metering

Proper organization of document processing. Typical requirements include:

  • Filled Application Form as available from local DISCO websites or AEDB.
  • Self-attested copy of applicant’s CNIC.
  • Copy of latest electricity bill along with proof of ownership or tenancy (title deed or lease agreement).
  • Vendor prepared Single Line Diagram (SLD) of your solar system.
  • Vendor’s professional certificate along with system design drawings.
  • Proof of purchased solar system and net meter price paid in Pakistan.
  • No Objection Certificate (NOC) if the premise has an association with housing societies.
  • By gathering beforehand, you reduce back-and-forth and improve approval timelines.

Submitting Your Net Metering Application to Your Local DISCO

Once completed by your vendor or you, this application package is submitted to the assigned DISCO after installation.

The submission is now possible physically at DISCO offices or online through new portals in some regions of DISCO.

DISCO issues an acknowledgement with a tracking or submission number.

In case of incomplete or mismatched documents, the application is likely to be returned with instructions for modification.

Once accepted, the application moves to a technical evaluation stage for processing.

It can also be tracked through DISCO portals or help desks.

Technical Evaluation & Inspection by DISCO 

The DISCO field engineers carry out on-site inspections. Verify the correct installation of the solar system by the design submitted. Confirm compatibility and accuracy of the proposed or installed net metering meter. Conduct safety checks: grounding, wiring, and fuse protections. Check against NEPRA and AEDB standards. Confirm system capacity is within licensed limits (usually not exceeding 1.5 times the sanctioned load). On passing inspection, will be given go-ahead regarding technical approval for actual net meter installation.

Installation Net Meter and Commissioning of System

Authorized, the DISCO fixes the approved certification. This is the bi-directional digital net meter which records both sides of the power flows (imported and exported power).  Installation is done at no cost to the customer with the engineers from the DISCO in a stipulated timeframe (normally within 10 to 15 working days).  Once the net meter is operational, your solar system will be synchronized to the grid officially.  You can now generate electricity, export surplus, and earn credits automatically through the net meter.  DISCOs provide manuals or portals for consumers to track their usage and exported units. 

Rates of Net Metering in Pakistan and Procedures for Billing 

In Pakistan, setting the price for export tariff for excess electricity is fed back into the grid which affects overall savings. 

  • The net-meeting tariff, depending somewhat on the region and by DISCO, is typically fixed by NEPRA. 
  • Currently, on net rates in Pakistan, consumers can expect rates between PKR 9 and 27 per kWh according to the amount and hour of export (peaks/off-peak) and region. 
  • The net calculates the monthly bill of the consumer as a net of consumed and exported units. 
  • Surplus credits can be carried forward for a whole year or offset under definite tariff agreements. 
  • Consumers just pay for the net consumption, the difference between power imported and power exported 
  • Reviewing tariff changes is crucial for a well-planned budget. 

Monitor and Maintain Your Net Meter and Solar System 

Maximize efficiency and gain from the installation by regularly cleaning solar panels so that sunlight absorption will be maximized.  Schedule regular maintenance of the vendor for inverters, wiring, and checking functionality of the net metering scheme.  Verify net meter readings regularly and match them with billing statements. Any irregularities or faults with the meter should be reported immediately to the relevant DISCO.  Some utilities offer mobile apps or online dashboards to track real-time generation and export data from the net meter.

Conclusion

Under the net metering scheme in Pakistan, consumers can generate clean solar energy, thus reducing their dependence on the grid, and simultaneously saving on electricity bills thanks to a specially commissioned program. The application process, however, requires proper groundwork: selecting the right, engaging AEDB-registered vendors, submitting compatible documents, and corresponding with your DISCO for approvals. Plan for yourself by knowing about the rates in Pakistan and net meter prices in Pakistan.

FAQs

net metering scheme enables you to use solar energy and feed excess electricity to the grid. It keeps track of the energy consumed and that which has been fed back, hence billing you for only the net amount.

net metering scheme application will be submitted along with supporting documents to the local DISCO or online portal. Following a verification and inspection process, a net meter will be installed.

Net Metering in Pakistan Rates vary from PKR 9 to 27 per unit exported, depending on the region and DISCO policy. 

Net Metering in Pakistan somewhere between PKR 20,000 and 60,000. A full-fledged 1 kW solar system with net metering would cost around PKR 150,000 or more. 

Net Metering in Pakistan in approvals, documentation issues, tariff changes, and problems with meter compatibility are some of the challenges, but they can be minimized by using certified vendors and keeping themselves updated net metering scheme.