New Connection of MEPCO Meter
Getting a New Connection of MEPCO Meter or Multan Electric Power Company is considered mandatory to avail oneself of a reliable and legal power supply for any resident or business in Southern Punjab, Pakistan. A MEPCO new connection is a patch between consumers, be they residential, commercial, or industrial, who seek the availability of electricity at a new house or location. New connection of MEPCO meter ensures that electric energy is supplied as per all safety norms laid down by the government. The entire jurisdiction is under WAPDA policies but practically, it runs by MEPCO, which will do everything from intake of application to installation of the meter and billings. It is important not only to have a continuous electric supply but also for legal reasons and safety from penalties for power theft.
Types of MEPCO New Connections
There are three main types of mepco new connection:
Category 1: Domestic and small commercial consumers with a load up to 15 kW. The kind of connections applicable here include most homes and small shops.
Category 2: Medium commercial and small industrial consumers whose load requirements fall within the range of 16 kW to 70 kW. This included but was not limited to bigger shops, offices, and small factories.
Category 3: Industrial consumers of load above 71 kW up to 500 kW, and most industries under this group, as well as bigger commercial complexes.
Documentation, fee structure, and the time taken to process new connection requests vary for each category. For example, a large number of processing times were traditionally fastest for Category 1 connections due to their simpler load requirements compared to Category 3 involving extensive survey and clearance requirements for installation, resulting in lengthy processing times.
New Connection of MEPCO Meter Fee Structure
It includes a variety of components:
- Processing of Application Fee: Normally around Rs. 500.
- Installation Charges Meter: The charges vary according to meter type and load, ranging from Rs. 2,000 to Rs. 5,000.
- Security Deposit: This is a refundable amount of between Rs. 3,000 and Rs. 10,000 according to the type of connection and property.
- Demand Notice Fee: This is the largest component of fees and varies by location. Rural areas may have domestic meters ranging from PKR 10,000 to 12,000, while posh societies or urban areas may have demanded fees of between PKR 15,000 and 25,000.
As these fees keep changing according to tariffs and government regulations, it is advisable to check these rates with official sources.
Documents Needed for New Connection Application with MEPCO
Considering that there will be several documents that one needs to submit along with the application.
- Property Ownership Documents: An example of such proof is a registered deed or allotment letter.
- Applicant CNIC Copy: The computerized national identity card of the applicant.
- Witness CNIC Copy: Required for especially 3-phase connections, generally 2 witnesses.
- Neighbor’s Electricity Bill Copy: Help confirm the locality/available services.
- Electrician Test Report: Confirms that internal wiring is according to the standards of safety.
- N. O. C.: If the person applying is a tenant and not the owner of the property.
- Bond and Power of Attorney: Apply where relevant, especially in case of multiple owners or legal representatives.
These documents can be uploaded at the time of application online or delivered physically to the offices.
Applying for New Connection of MEPCO Meter Online
mepco new connection has introduced an online application system for a new meter to make things easier and faster. Customers now have to visit the website of MEPCO or download the Smart App on their smartphones. Selecting mepco new connection as the distribution company and entering the subdivision, the customer is required to fill out an application form online that covers the personal details, property details, and the type of it required. The uploaded document would allow scanning the copies of all necessary documents, reducing the burden on physical submissions. After filling out the form online, customers have to take a print-out for verification and submission to the nearest office. This online process improves speed initially near the connection process, as it reduces paperwork and minimizes errors. This process makes things more comfortable and transparent.

New Connection of MEPCO Meter Procedure Step by Step
All New Connection of MEPCO Meter include critical steps itokeep compliance and safety, as follows:
- Application Submission: The applicant submits the completed application form and all other requisite documents online or/in the office.
- Verification and Site Survey: The MEPCO team conducted a site survey, whereby verification of wiring compliance and feasibility of the connection was made.
- Demand Notice Issuance: MEPCO will issue a notice of demand which states the fees payable with respect to the surveyed application results.
- Payment of Demand Notice: The applicant will pay fees at designated banks or through approved online payment methods.
- Submission of Payment Receipt: Evidence of payment has to be submitted with respect to verification.
- Meter installation: MEPCO schedules installation within the property with the meter and equipment related to it.
- Final Inspection and Activation: After installations are done, It checks the setup in order for safety and makes the activation of the connection.
Every step ensures keeping the safety measures and compliance with regulations on power supply reliability.
MEPCO Tracking Application of New Connection
MEPCO has an New Connection of MEPCO Meter system to apply for a new connection. Using either the CNIC number or the specific 14-digit reference number issued at the application submission or on the demand notice, an applicant can visit the tracking portal or even access it through the mobile app. The system updates the status on document verification, completion of site survey, issuance of demand notice, payment confirmation, and scheduling meter installation. This transparency keeps applicants informed and saves time and effort by diminishing the necessity to visit offices repeatedly.
Services on Meter Tracking by wapda new connection
MEPCO also provides this tracking service for existing consumers on the meter, besides the ones newly introduced. Through this portal online or via the mobile app, consumers can check the status of their new meter installation, meter reading, and bill history. This service empowers consumers to ensure that the meter is working and to make bill corrections where required. It also identifies shortcomings as early as possible to take corrective actions. It enhances transparency and consumer satisfaction in knowing exactly how much electricity they are consuming and the billing.
WAPDA New Connection VS MEPCO New Connection
WAPDA stands for Water and Power Development Authority, which is responsible for all policies regarding the generation and distribution of electricity in Pakistan at the federal level. MEPCO, as a regional electricity distribution company, operates under WAPDA and caters to Southern Punjab. Therefore, when people say the “WAPDA new connection,” they often refer to the local MEPCO-managed new electricity connection process. While it sets the framework for regulations and tariffs, It is in charge of application processing, site surveys, and even the installation of meters. By making a distinction between the two, an applicant can know where to seek different services and clarifications.
Benefits of the MEPCO Online Meter Application
There are several benefits of the online meter application system for consumers. It allows the consumer to apply from the comfort of his home; thus, it saves him repeated visits to offices to apply for new connection lines. There is a lower risk of loss and human error with electronic document uploads. Moreover, applicants have real-time updates and notifications concerning their application status on the system. Due to online application regulations, applications are often processed faster through a more streamlined workflow with reduced manual intervention. Keeping abreast with such modernization shows MEPCO’s commitment to improved customer service and efficiency.
MEPCO New Connection Fee Payment
The applicants must pay the amount notified to them in the demand notice:
- Payments are generally accepted in designated banks listed on the demand notice.
- Online banking and mobile banking applications, which support payments, are also acceptable.
- Always keep the payment receipt safe for any future references to be submitted to it.
- Timely payments bring the expedited cooperation of the company as schedules the date of installation depending on payment confirmation.
MEPCO New Meter Installation Time Frame
The period of processing a new MEPCO connection depends on the category and could be extended. classifies new connections according to load capacity:
Category 1 (Up to 15 kW) – Estimated Timeline
Category 1 applies to domestic and small commercial users like houses, small shops, etc. We provide the estimated timeline for the complete process below.
| Steps | Procedure | Days |
| 1 | Fill out the online application form (ENC) and attach all required documents. | 1 day |
| 2 | Print the submitted documents, make a file, and submit it in the MEPCO subdivision office for approval. | 1 day |
| 3 | Upon application approval, the concerned officer will verify documents and schedule the site survey. | 4 days |
| 4 | .After the survey is complete, MEPCO will process your application and generate the new connection demand notice. | 4 days |
| 5 | .On completion of processing, an SMS notification will be sent to you stating: “Your Demand Notice 2025 is ready. Please print and pay at the bank.” | 1 day |
| 6 | Get a wiring test report and attach it to the paid demand notice | 1 day |
| 7 | Application status will be tracked only postpayment. | 20–30 days |
| 8 | Connection order issuance. | 5 days |
| 9 | Meter arrangement by MEPCO storekeeper. | 10 days |
| 10 | Meter installation | 1 day |
Total Estimated Time: 48 Days
Note: Actual times will vary based on location, prevailing load, and verification processes.
Category-2 (16kw to 70 kws/400 volts)
Additional verification and processing steps mean that, unlike the Category-1 procedure, the procedure for the approval of a Category-2 MEPCO connection may take up to 68 days to complete.
Category-3 (71kW to 500kW / 400 Volts)
Same as the Category-1 and Category-2 MEPCO connection acquisition process. However, due to higher load capacity and additional approvals, the connection installation process may take up to 100 days from the date of application submission.
These timeframes cover all stages right to the point of installation of the meter. Delays may occur due to insufficient documentation, payment delays, or equipment shortages. It would be advisable for all parties concerned to ensure all documents are complete and to track their applications often to prevent such evitability overtime.
Conclusion
Getting a MEPCO new connections is a fulfilling standardized process which not only attains safety as a goal but also provides assured electricity access to consumers in Southern Punjab. Once the procedure involved right from application, documentation, fee payment, and meter installations,ise understood, the applicant side can easily conduct the procedures. Online applications with tracking facilities have made this process more transparent and user-friendly. MEPCO aims to provide quality service by successfully ensuring electricity without interruption, whether it is for household, business, or industrial purposes.