Temporary MEPCO Connection image

How to Get a Temporary MEPCO Connection

Temporary electricity connection needs, like for construction sites, events, or temporary residential requirements, have to obtain a temporary MEPCO Connection. A Temporary MEPCO Connection is a kind of electricity supply that is provided by MEPCO for a short period, usually for a maximum of up to six months, to meet the short-term requirements of consumers for electricity temporarily to be used during construction, special events or exhibitions, or temporary resident arrangements. Unlike permanent connections, temporary connections can be legally used to supply electricity without a long-term contractual binding. Such a type of connection thus ensures electricity consumption under regulation by monitoring operation and billing according to MEPCO’s policy, thus providing a safe and authorized power supply.

Types of Temporary Connections Offered by MEPCO

MEPCO has two major categories for various consumers:

Residential Temporary Connection: For people who need electricity temporarily for homes, guest houses, and other forms of temporary living arrangements. This applies to people who stay only for a short time, where their houses are already completed but are awaiting a permanent connection. 

Industrial/commercial Temporary Connection: This is meant for business, construction, exhibitions, fairs, or any commercial activity that needs to draw power for a short period. Load capacity demands and the charges differ, subject to the nature of the business and its scale.

Advantages of Temporary Electricity Connection From MEPCO

Fast Processing: Most people can expect their temporary connections to be processed much faster than their permanent ones and start using their electricity without long waiting periods.

Limited-Time Validity: The connection, being valid only for a short period, is ideal for short-lived projects and events that do not require permanent infrastructure.

Safety and Legality: Compliance with electricity regulations regarding legal temporary connection usage will prevent illegal or unauthorized uses risks associated with these.

Extension Facility: In the event where the temporary need exceeds the time initially provided, consumers may apply for an extension of continued use during the period of expiration by making a formal request and paying designated fees to MEPCO.

Avoid Penalties: By applying for a proper mepco connection as temporary, consumers are saved from all fines and legal actions emanating from unauthorized use of electricity.

Eligibility Criteria for a Temporary MEPCO Electricity Connection

Certain criteria have to be met by the applicants:

  1. The consent of the property, where the connection is required, must be from an owner or an authorized occupant.
  2. The applicant has to produce any valid identification bearing, eg, a Computerized National Identity Card (CNIC).
  3. They must present any ownership or tenancy proof, such as a sale deed, rent agreement, or an affidavit.
  4. He/she needs to pay all the Mepco temporary charges and any security required to obtain this connection.
  5. Submit a duly filled Temporary Connection Application Form along with compliance with the policies and safety regulations governing MEPCO.

Documents for Application of Temporary MEPCO Connection.

Applying for it requires preparing and submitting specific documents:

Attested Copy of Applicant’s CNIC: This generates identification of the applicant in this connection application.

Attested Copy of Witnesses CNIC: A witness will confirm a legitimate application.

Proof of Property Ownership or Tenancy: Sale deeds, rent agreements, or even utility bills can prove that you are entitled to electricity at that location as per utility rules.

Copy of Neighbor’s Electricity Bill: It is requested sometimes.

Filled Temporary Connection Application Form: This document provides all the necessary information about the applicant, property, and requested load.

Additional Documents: May be different according to the types of connections, or maybe at the discretion of MEPCO, other documents may include NOC from local authorities, or building permit.

Having all these documents ready has proved to help speed processing and smooth work, thus avoiding any delays.

How to Fill the Temporary Connection Application Form?

The Application Form is significant in the application process. This is the guide to filling it out correctly:

Applicant’s Information: Enter your full name, CNIC number, contact number, and address clearly.

Property Details: Provide the exact address where the temporary connection is needed, including city, street, and plot number.

Purpose of Connection: State the reason why the temporary connection is required, for example, construction work or events, or to be used for temporary housing.

Requested Load: Specify the estimated electricity load in kilowatts (kW) for the application of the service based on the workings of the equipment or needs.

Duration: Length of time it is estimated that the temporary connection will be needed (usually not exceeding six months).

Signatures: Both the applicant and a witness must sign the form to validate the application.

temporary electricity connection mage

Step-by-Step Procedure to Apply for Temporary MEPCO Connection

The process of applying for a temporary electricity connection from MEPCO:

Visit the Nearest MEPCO Office: This is how to visit the nearest Customer Service Center or regional office.

Temporary Connection Application Form: Derive the form yourself or download from the public website of MEPCO if it is available.

Filling of the Form: Fill in the empty spaces in the form with the accurate information as explained above.

Submit Form with Documents: The completed application form shall be submitted at the MEPCO office along with the rest of the required documents.

Pay the Temporary Connection Fee: Mepco’s temporary connection fee and a dip security deposit, which is applicable according to the requested load, should be paid.

Site Inspection: MEPCO Technical Team would visit the site to check the premises for feasibility of the connection.

Meter Installation: After approval, MEPCO will install a temporary meter and connect it to the electricity supply.

Connection Activation: This will activate your temporary connection, and this will be followed by delivery of a reading slip of the meter.

Extension (if needed): If an extension of the connection is needed, a written request must be submitted before the expiry of the connection and the extension fee paid.

The MEPCO Temporary Connection Fee and Security Deposit

It is charged according to the type of connection and the requested electrical load. Here is a brief example:

Connection TypeTypical Fee Range (PKR)Security Deposit (Approx.)
Residential Temporary5,000 to 15,0001,500 to 3,000
Commercial Temporary15,000 to 40,0005,000 to 10,000

How to Disconnect 

Once you are done with the temporary electricity requirement, you have to disconnect the temporary MEPCO connection formally to avoid charges. Start with the nearest MEPCO office, where you would request a disconnection by providing details. Clear all electricity usage dues before disconnection since payment confirmation brings a team from MEPCO to your locality to remove the meter and installed equipment at your place. After the disconnection and verification process, GETS will start processing it for refunding the security deposit minimizing the impacts of the nearness of the due amounts. Having all the payment receipts and documents handy will go a long way to facilitating a smooth disconnection and refund process.

Temporary MEPCO Connection Validity and Extensions

A temporary electricity connection from MEPCO is usually temporary for six months from the date it has been activated. In case your project or event extends beyond that time frame:

  • Submit a request for extension by writing to MEPCO before the expiry date.
  • Pay the related extension fee or demand notice as determined by MEPCO.
  • MEPCO will examine the submitted application, followed by an inspection.
  • Approval will come with an extension of connection validity for an additional period, usually another six months.

Conclusion

Getting a Temporary MEPCO Connection is an easy process to facilitate legal and safe access to electricity for short-term needs. By understanding the application procedure, documentation to be submitted, mepco temporary connection fee and extension policies, consumers can assure themselves of uninterrupted power supply at construction sites, events, or temporary houses. Always follow guidelines and maintain communication regarding the same with their offices so that there would not be a delay or levy of penalties. This complete guide is here to serve and empower you with all the information necessary for your temporary MEPCO electricity connection process being smooth and efficient.

FAQs

A Temporary MEPCO Connection is valid for typically six months, but it can be extended by applying before the expiry date and paying the extension fee.

Yes, MEPCO is providing temporary connections for residential as well as commercial purposes.

CNIC of the applicant, CNIC of a witness, ownership or tenancy proof, electricity bill of a neighbor, and application form.

It differs for each load type. For residential, costs at around PKR 5,000-15,000; for commercial establishments, costs at PKR 15,000-40,000, and a refundable amount towards a security deposit for every connection.

Yes, MEPCO has to inspect sites before installing meters and activating the connection.