For home remodeling, relocating the MEPCO electricity meter is sometimes a necessary step. It could also be done in case there are safety hazards or the current location is inaccessible or unwieldy. Moving the Mepco meter involves relocating the meters from their current positions to new locations within the same subdivision, ensuring uninterrupted supply. Mepco meter relocation means transferring your existing electricity meter from one location to another within the same property or subdivision area. This is very much necessary when the existing meter location becomes inconvenient to access or even unsafe. For instance, during home renovations, the meter box may need to be moved to a new wall or safer away from moisture or direct sunlight. Therefore, it ensures MEPCO’s meter reading and maintenance teams can easily access the meter for compliance with electrical installation safety standards. 

Who Can Apply for Mepco Meter Relocation?

Only registered MEPCO consumers with valid electricity connections can apply for meter relocation. The applicant must be the owner of the property or have explicit written consent from the owner to apply for the change. Moreover, all outstanding electricity bills must be cleared before submission of the application. This requirement ensures that the service is only being availed of by genuine consumers, thereby keeping MEPCO’s record accurate.

Note that this happens only in the same subdivision. If you have moved to another area or subdivision, this will require a new connection instead of replacing the existing connection. This will help MEPCO to ascertain the proper jurisdiction and billing. 

Why Relocate Your MEPCO Electricity Meter?

There are so many explanations concerning practicality for consumers:

Home Renovation or Extension: When remodeling your house, the meter box location may interfere with new walls or designs, necessitating a move.

Safety Concerns: The current meter location might expose it to water damage, vandalism, or accidental impact, risking meter malfunction or hazards.

Accessibility: A meter placed in a hard-to-reach area complicates meter reading and maintenance. Relocation makes it easier for MEPCO staff to perform their duties.

Compliance with Regulations: MEPCO periodically updates its installation standards. Moving the meter might be required to meet new safety or technical guidelines.

Property Sale or Rental: A well-placed meter box can enhance the property’s appeal and avoid disputes with tenants or buyers.

Documents Required for Mepco Meter Relocation

The first step is to obtain and register important documents for the MEPCO subdivision offices before going for the MEPCO meter replacement.

Written Application: Formally addressed letter addressed to the Subdivision Officer regarding meter relocation specifying the present new location.

Last Paid Electricity Bills: Proof of true state electricity record.

Proof of Ownership: Property deed, sale agreement, or rent agreement with the owner’s permission.

Applicant’s CNIC: Valid computerized national identity card for applicant’s verification.

Site Layout for Sketch: Just a simple sketch that shows old and proposed new meter locations to assist MEPCO’s technical team during examination.

The complete and accurate documentation helps you avoid long delays and smooth processing of the request.

Step-by-step Application Process of Mepco Meter Relocation

Simple but requires following the official procedures.

mepco meter replacement charges image

Visit the MEPCO subdivision office: Go to the office that looks after your area and fetch the application form for meter relocation or submit a written request.

Submission of documents: All applicant documents are submitted with the application.

Site inspection: The technical staff of MEPCO will visit the property to inspect current and proposed meter locations, the feasibility study, and safety-related aspects.

Cost Estimation: Inferred from inspection, MEPCO will assess the relocation charges, along with labor and other material relevancies, and other requirements. Payment, demand notice, or payment instructions will be issued. Payment through authorized channels is preferred. 

Relocation Work: The work will thus be organized by MEPCO technicians for disconnecting the meter from the old position and reinstating it at the new site, after confirming payment, so that it can proceed with the tasks of relocation.

Final verification: Calibrations will be verified by MEPCO, and after that, normal readings and billing will be enabled for the system. 

Usually, this does take between 3-7 working days, depending on the workload and complexity.

Understanding Mepco Meter Replacement Charges 

Mepco meter replacement charges or relocation charges depend directly on which type of connection it is and the complexity of the job. Generally, single-phase residential connections have lower charges compared to three-phase commercial or industrial meters due to the equipment and wiring differences.

Connection TypeEstimated Cost (PKR)Remarks
Single Phase3,000 – 7,000Standard residential connections
Three Phase10,000 – 20,000Commercial or industrial connections

There can be additional charges if new poles, long wiring, or special materials are required.

How Would You Pay For Mepco Meter Relocation?

After your demand notice, it allows you the choice to use many methods for effecting payment for the relocation:

Authorized Banks: Go to any MEPCO-designated bank to pay the relocation fee.

Online Payment Portals: Online payment is now available at MEPCO’s official portal and authorized mobile banking apps.

Pay Direct at Customer Services: Pay directly in MEPCO Offices or Points of Customer Services.

Always save the transaction confirmation or payment receipt. This document is required for MEPCO to begin performing the relocation works, as well as for your documentation.

Conclusion

Mepco meter relocation is a compulsory measure towards regulation and safety intended for consumers who may want to transfer their electricity meter to a different location or site of the same property or subdivision. By applying the following MEPCO standards with the complete documentation and fees paid, the process would be ensured to allow a safe and hassle-free transfer for a meter shift. Always apply and pay through the official channels. Keep your electricity bills fully updated. Consult MEPCO technicians about the best new meter location.

FAQs

The applicant should apply to MEPCO with the required documents, pay the relocation charges after inspection, and then wait for MEPCO to relocate the meter within a few days.

All relocations are only allowed within that same subdivision. For a different area, you must apply for a new connection.

You need a written application, a latest paid bill, proof of ownership or permission, CNIC, and a sketch of old and new meter locations.

mepco meter replacement charges range for relocation is between PKR 3000 to 7000 with a complexity factor, while three-phase connections range from PKR 10000 to 20000.

No, only mepco meter replacement charges authorized team can do the transfer of meters for safety and legal purposes.

Similar Posts

Leave a Reply

Your email address will not be published. Required fields are marked *